Target Production Calculator
Bauxite Ore
Choose recipe and clock speed, then instantly compute machine counts, power load, and full upstream dependency balancing.
Clock Speed 100%
% (Linear power scaling in 1.0)
Current Selection
Machine Miner Mk.1
Recipe Output @ Clock 60.00 / min
Machine Power @ Clock 5.00 MW
Target Machine
1.00 x Miner Mk.1
Target Power
0.0 MW
Factory Total Power
0.0 MW
Direct Inputs (for selected recipe)
Full Machine Requirements (All Levels)
Raw Resource Inputs (All Levels)
Byproducts / Recycle Credits
Dependency Tree (expand/collapse)