Charging recovery
Model the whole charging day, not one source in isolation.
Start with the load and array baseline from the system sizer. Add only the charging paths you can realistically sustain, then see whether they protect critical loads, cover the full day, and leave enough surplus to refill the reserve.
Charging and recovery planner
Can the available charging paths cover the day and refill the reserve?
Combine solar, DC–DC, shore, and generator contributions without hiding the source assumptions, then use only the energy left after daily loads to estimate recovery time.
The values below are editable planning baselines. Change the few inputs you know; open Advanced assumptions only when they change your decision.
Charging result
—
—
Planning brief
Carry the coverage gap and recovery window into source verification.
Copy the load boundary, each daily contribution, the resulting balance, and the next check together.
Next decision
Plan tools
Keep this useful version close, shareable, and easy to revisit.
Recent saved plans 0
Source boundary
DC–DC, shore, and generator entries use delivered charging watts multiplied by realistic daily availability, keeping every contribution inspectable.
Load priority
Critical-load coverage is shown separately from full-load coverage so optional energy does not hide a resilience shortfall.
Recovery rule
Only energy left after the full daily load refills the recovery target; a daily deficit never produces an artificial recovery estimate.