Remote-work van baseline

Plan a remote-work van power system

Start with connectivity, laptop charging, refrigeration, lighting, and reserve for weather variability.

Editable baselineReplace appliance watts, daily runtime, peak overlap, and sun hours with the conditions you expect to use.Next checkModel solar and DC-DC as separate daily sources before relying on driving to close the energy gap.

Planning tool

Remote-work van: adjust the baseline

Separate must-run energy from shed-able loads, then pressure-test battery reserve, solar recovery, continuous power, and startup demand.

View assumptions and sources →

The values below are editable planning baselines. Change the few inputs you know; open Advanced assumptions only when they change your decision.

Advanced assumptionsChange storage reserve and DC architecture after the load boundary is defined.
Battery planning range——
Solar recovery range——
Continuous inverter check——
Startup surge check——
Controller current range—battery-side current check; verify PV open-circuit voltage separately
Battery-side protection check——
Dominant assumptions

What moves this result most

    —

    Next decision

    Compare this baseline against roof space, seasonal production, and your actual equipment documentation.

    Planning brief

    Turn the estimate into checks you can verify.

    Use this pre-purchase brief to compare component documentation against the plan you just built.

    Keep this useful version close, shareable, and easy to revisit.

    Battery storage

    ——

    Inverter

    ——

    Solar array

    ——

    Charge controller

    ——

    What becomes constraining first?

    —

    —

    —

    Must match

      Optional paths

        Resolve before shortlist

          Before selecting components: verify manufacturer documentation for surge power, BMS discharge and charge limits, PV input voltage, temperature limits, cable sizing, fuses/breakers, mounting, and local requirements.

          Need a different load profile? Start a custom plan →